|
The Neath and Tennant Canals are two independent but linked canals in South Wales that are usually regarded as a single canal. The Neath Canal was opened from Glynneath to Melincryddan, to the south of Neath, in 1795 and extended to Giant's Grave in 1799, in order to provide better shipping facilities. With several small later extensions it reached its final destination at Briton Ferry. No traffic figures are available, but it was successful, as dividends of 16 per cent were paid on the shares. The canal was long and included 19 locks. The Tennant Canal was a development of the Glan-y-wern Canal, which was built across Crymlyn Bog to transport coal from a colliery on its northern edge to a creek on the River Neath called Red Jacket Pill. It closed after 20 years, but was enlarged and extended by George Tennant in 1818, to provide a navigable link from the River Neath to the River Tawe at Swansea docks. In order to increase trade, he built an extension to Aberdulais basin, where it linked to the Neath Canal. The extension was built without an act of Parliament and there was a long delay while Tennant attempted to resolve a dispute with a landowner over the routing of the canal. Once opened, much of the Neath traffic used the Tennant Canal, as Swansea provided better facilities for transferring cargo to ships. Use of the canals for navigation ceased in the 1930s, but they were retained as water channels to supply water to local industries and to Swansea docks. The first attempts at restoration began in 1974 with the formation of the Neath and Tennant Canals Society. The section north of Resolven was restored in the late 1980s, and the canal from Neath to Abergarwed has been restored more recently. This project involved the replacement of Ynysbwllog aqueduct, which carries the canal over the river Neath, with a new plate girder structure, believed to be the longest single-span aqueduct in Britain. Some obstacles remain to its complete restoration. In 2003 a feasibility study was published, suggesting that the canal could become part of a small network, if it was linked through Swansea docks to a restored Swansea Canal. ==Neath Canal== Encouraged by the recent grant of an Act of Parliament to authorise the building of the Glamorganshire Canal, it was resolved at a meeting at the ''Ship & Castle'' public house in Neath on 12 July 1790 to build a canal from Pontneddfechan to Neath, and another from Neath to Giant's Grave. Among those attending was Lord Vernon, who had already built a short canal near Giant's Grave to connect the River Neath to furnaces at Penrhiwtyn. Thomas Dadford was asked to survey a course, and he was assisted by his father and brother. He proposed a route which required 22 locks, part of which was a conventional canal, while other parts used the River Neath. Dadford costed the project at £25,716, but in early 1791 Lord Vernon's agent, Lewis Thomas, proposed two new cuts, and the idea of using the river was dropped soon afterwards. The canal was authorised by an Act of Parliament passed on 6 June 1791, which created ''The Company and Proprietors of the Neath Canal Navigation'', who had powers to raise £25,000 by the issue of shares, and an additional £10,000 if necessary. As well as building the canal, the Canal Company could build inclined planes, railways or rollers if required, and could optionally use the bed of the River Neath. The canal was to run from Glynneath (called Abernant at the time), which was not as far up the valley as Pontneddfechan, to Melincryddan Pill at Neath, where it would join the river. Thomas Dadford was employed as Engineer, and construction started from Neath, northwards towards Glynneath. The canal had reached the River Neath at Ynysbwllog by 1792, when Dadford resigned to take up work on the Monmouthshire Canal. He was replaced by Thomas Sheasby,〔 who failed to complete the canal by the November 1793 deadline given to him, and was arrested in 1794 for irregularities in the accounts of the Glamorganshire Canal. The canal company completed the building work by 1795, using direct labour, although the lock into the river was never built. Rebuilding of locks and other improvements continued to be made for several years afterwards. There was no immediate pressure to extend the canal to Giant's Grave, as access to Neath for coastal vessels of up to had been improved in 1791 by the construction of the Neath Navigable Cut.〔 However, a second Neath Canal Act was passed on 26 May 1798,〔 to authorise an extension of about to Giant's Grave, where better facilities for transferring goods to seagoing vessels were available. Thomas Dadford again surveyed the route, but Edward Price from Gofilon acted as engineer. This part of the canal was financed by Lord Vernon, although he was also paid £600 for his Penrhiwtyn canal, which became part of the main line. The extension was completed on 29 July 1799, and terminated at a basin close to Giant's Grave Pill. Flood gates on the canal enabled water to be released into the pill to scour it of silt. The total cost of the project was about £40,000, which included 19 locks and a number of access tramways. Between 1815 and 1842, additional docks and wharfs were built at Giant's Grave, extending the canal slightly, and the canal was extended to Briton Ferry by the construction in 1832 of the Jersey Canal, which was about long, and was built without an Act of Parliament by the Earl of Jersey. Another short extension was made around 1842. The final length of the canal was . From the northern terminus, a tramway connected the canal to iron works at Aberdare and Hirwaun. This was built in 1803, and included an incline just north of Glynneath, which was powered by a high-pressure Trevithick steam engine.〔 The Tappenden brothers had bought into the iron industry in 1802, and built the tramway because of high tolls on the Glamorganshire Canal, but by 1814 they were bankrupt, and had no further connections with the canal.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Neath and Tennant Canal」の詳細全文を読む スポンサード リンク
|